![]() ![]() ![]() In their study of a 116 ha area within Ninigret Pond, a 667 ha coastal. Dredge areas were surveyed and volumetric analyses completed to provide updated estimates of available dredge material volumes available to implement restoration. the permanently low hydraulic gradient, leaching is not an important process in. Compliance support included developing permit applications to respective state and federal agencies, and an Environmental Assessment to meet NEPA requirements. The plan included metrics and criteria supporting development and implementation of the project’s adaptive management plan and associated post-restoration monitoring. Tidal records and sea level rise projections were evaluated and used to develop an integrated restoration plan. ![]() Army Corps of Engineers Regional Sediment. Our team conducted targeted sediment and vegetative assessments at the 38-acre site. Download Citation NINIGRET POND, RI FLOOD SHOAL DREDGING/SEDIMENT BASIN CREATION FOR HABITAT RESTORATION PERFORMANCE EVALUATION As part of the U.S. The climate resiliency project addressed the continuing degradation and loss of valuable salt marsh areas in Ninigret Pond due to changing tidal conditions. On the Headquarters Unit of Ninigret, where you will find Kettle Pond Visitor. The Cross Refuge Trail moves through some excellent birding locations with some fresh-water sources for the many migratory birds that stop here to rest and re-fuel. Fuss & O’Neill assisted the RI Coastal Resources Management Council, USFWS, Save the Bay and the Town of Charlestown to undertake one of the first dredging and salt marsh restoration projects in Rhode Island. The Lavallee Cross Refuge Trail and the Charlietown Runway Trail connect the west and east entrances. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |